Theme
PHASE 6 RC • Phase 5 theme layer completeEarth Commercial • STS / STB / STW / STD / STK
Ultrasonic Hygiene SuiteUST Platform › Validation Roadmap
UST Validation Roadmap • Phase 4

Architecture before claims

The program follows the existing AEGIS / UST progression from master architecture through subsystem definition, engineering specification, 3D CAD, simulation, test, certification and production documentation.

1Architecture

System intent, product families and shared interfaces.

2Requirements

Measurable product requirements and verification method.

33D CAD / Analysis

Packaging, modal, acoustic, thermal and flow studies.

4Prototype / Test

Bench rigs first; integrated units only after subsystem learning.

5Certification / Production

Safety, EMC, plumbing, accessibility, quality and manufacturing records.

Claim Control

Research status is visible

INTAKE

External idea, AI result, vendor lead or unreviewed research.

CANDIDATE

Technically plausible direction selected for analysis or test.

BASELINE

Current controlled architecture position; may still require validation.

VALIDATION

Under simulation, test, standards review or source verification.

VERIFIED

Supported by evidence appropriate to the requirement.

RELEASED

Approved for controlled engineering or public use.