Authoritative source
Assign an identifier, owner, revision, status, and storage location to every controlled record.
Authoritative records • Change control • Release discipline
Aurora’s technical credibility depends on knowing which document, model, drawing, dataset, calculation, rendering, and public claim is authoritative—and who approved each change.
Structure
The public page explains the decision structure while detailed records remain controlled offline.
Assign an identifier, owner, revision, status, and storage location to every controlled record.
Record the reason, affected requirements, technical review, safety/regulatory impact, approval, and effective revision.
Label concept, analysis, simulation, component test, integrated prototype, independent verification, and field evidence distinctly.
Trace every quantitative or maturity claim back to a dated source and an authorized disclosure decision.
Retain questions, options, assumptions, advice, approvals, conditions, and the final outcome.
Back up critical records, calendars, credentials, counsel files, contracts, and dependency maps with recovery instructions.
Sequence
Each stage produces a reviewable record before the next commitment is made.
Continue