Phase 6 · Publication Authority & Final Integration

Publication Authority & Source Register

This page defines the publication rules used across the Reactor Programs branch: what counts as authoritative evidence, how maturity is labeled, which terminology is locked, how illustrative renderings are treated, and how release integrity is verified.

Phase 6 status: source hierarchy, metadata, terminology, maturity vocabulary, cross-linking, and release controls reviewed 2026-10-06. Project-specific engineering, licensing, procurement, or safety determinations remain outside this public reference site.
Controlled vocabulary

Publication maturity labels

These labels are evidence categories for public communication. They are not numerical technology-readiness levels and do not replace design-specific licensing or safety findings.

LabelPublication meaning
Commercial OperationTechnology family represented by operating commercial electricity-generating reactors; design- and jurisdiction-specific licensing still governs each plant.
Limited / Specialized OperationTechnology has operating examples or operational heritage, but deployment is limited, specialized, or not a broad commercial power fleet.
Construction / First-of-a-KindA current project has entered construction or equivalent first-of-a-kind implementation, while broad fleet maturity remains unproven.
Demonstration / LicensingTechnology is in demonstration, test, licensing, or pre-commercial deployment rather than broad commercial operation.
Research & DevelopmentTechnology remains primarily in experimental, engineering-development, or research programs.
Historical ResearchTechnology was materially investigated in historical programs but is not presented as a current deployment pathway.
Conceptual Future StudyAurora or external future-study material that is explicitly conceptual and not presented as demonstrated or licensable technology.
Mixed / Design-Dependent MaturityThe page groups multiple technologies, designs, or subsystems whose maturity differs; no single readiness label is valid for the whole category.
Terminology lock

Terms that must remain consistent

These rules prevent common category errors and marketing-style overclaims. The full definitions remain in the master glossary.

Preferred termPublication ruleAvoid / qualify
reactor familyPreferred for a broad technology class such as PWR, BWR, SFR, or MSR.Avoid implying every design in the family has identical performance, safety, or maturity.
SMRSmall modular reactor: a size/deployment class, not one coolant, fuel, or neutron-spectrum architecture.Do not treat SMR as a single reactor-physics family.
microreactorA very small reactor deployment class; exact regulatory and technical boundaries are jurisdiction- and design-specific.Do not use as a synonym for TRISO or transportable reactor.
TRISO fuelCoated-particle fuel form.Do not describe TRISO itself as a reactor architecture.
molten-salt reactorA family in which salt is central to heat transport and, in some concepts, also contains fuel.Distinguish fuel-salt concepts from solid-fuel salt-cooled reactors.
fusion machineUse for the U.S. regulatory category when discussing NRC fusion-machine rulemaking.Do not automatically call every fusion experiment a commercial reactor or power plant.
fusion power plantReserve for an integrated system intended to produce useful power, including heat extraction and balance of plant.Do not equate plasma gain or target gain with net-electric plant performance.
commercial operationUse only for operating commercial service supported by authoritative evidence.Do not substitute roadmap targets, licensing activity, construction, or demonstration.
demonstrationUse for a system intended to prove integrated technology or mission capability before broad commercial deployment.Do not use as a synonym for commercial fleet.
first-of-a-kind (FOAK)The first implementation of a design or class under a defined deployment context.Do not imply follow-on economics or schedule are already demonstrated.
concept renderingIllustrative visual communication, not a design drawing, safety analysis, or licensing basis.All AI or conceptual images must remain subordinate to page text.
maturity classificationPublication-facing evidence category defined by this Phase 6 authority.Do not infer a technology-readiness level number unless a source explicitly supplies one.
passive safetyA function relying primarily on inherent physical behavior or stored energy rather than continuous active power or control.Do not use “inherently safe” as a blanket claim.
safeguardsUse in the appropriate NRC/IAEA context for nuclear material control/accounting and nonproliferation obligations.Do not publish protected safeguards information or operational security detail.
HALEUHigh-assay low-enriched uranium: above 5% and below 20% U-235.Do not state that every advanced reactor requires HALEU.
Source hierarchy

Primary publication authorities

Regulatory and government sources control regulatory status, licensing terminology, operating-fleet claims, environmental review, safeguards, and current program status. International programs and research institutions supplement technology context.

U.S. NRC — Power ReactorsRegulator · Commercial U.S. PWR/BWR fleet and reactor-type contextU.S. NRC — Advanced ReactorsRegulator · Advanced-reactor licensing and regulatory program contextU.S. NRC — 10 CFR Part 53 effective datesRegulator · Confirms 2026 effectiveness of Part 53 provisionsU.S. NRC — Proposed Part 57Regulator · Proposed microreactor and comparable-risk licensing frameworkU.S. NRC — Fusion Machine RulemakingRegulator · Current fusion-machine proposed-rule statusU.S. NRC — Emergency Preparedness RulemakingRegulator · Performance-based emergency preparedness for SMRs and other new technologiesU.S. NRC — New Reactor GEIS (NUREG-2249)Regulator · 2026 generic environmental impact statement for licensing new nuclear reactorsU.S. NRC — Nuclear Security and SafeguardsRegulator · Public security, safeguards, and information-protection boundariesU.S. NRC — Information SecurityRegulator · SGI, classified information, and SUNSI public guidanceU.S. NRC — Decommissioning Financial AssuranceRegulator · Decommissioning funding obligations and lifecycle contextU.S. DOE — HALEU Allocation ProcessGovernment · HALEU supply and advanced-reactor deployment contextU.S. DOE — Fusion EnergyGovernment · Current U.S. fusion commercialization roadmap contextU.S. DOE — Fusion Science & Technology RoadmapGovernment · 2026 fusion science, technology, infrastructure, and milestone roadmapIAEA — Small Modular ReactorsIntergovernmental · International SMR technology and deployment contextIAEA — Fusion EnergyIntergovernmental · International fusion research contextGeneration IV International ForumInternational program · Advanced reactor family research and development contextNASA — Fission Surface PowerGovernment · Space fission surface-power development context
Evidence discipline

How claims are controlled

Regulatory status

Use the regulator or governing authority. A proposed rule is labeled proposed; construction authorization is not commercial operation; a roadmap target is not a delivered plant.

Technology maturity

Use operating history, construction status, demonstration evidence, and authoritative program records. Vendor intent alone does not establish maturity.

Illustrations

Renderings are explanatory visuals. Embedded labels never override the controlling HTML text, source register, maturity badge, or licensing boundary.

Security boundary

Public material may explain safeguards, cybersecurity, and physical-protection concepts at high level but excludes protected information, response tactics, sensitive layouts, and adversary-useful detail.

Machine-readable release controls

Phase 6 registers

The release includes CSV registers for source traceability and locked terminology, plus a branch sitemap, QA report, file manifest, and SHA-256 checksum ledger.

Phase 7 • Release Certification & Production Integration

Release certification

Release candidate

This page has passed the Reactor Programs Phase 7 branch-level release review for internal routing, asset references, canonical metadata, maturity and terminology controls, source-authority links, accessibility essentials, responsive markup, and release traceability.

Branch statusPhase 7 release candidate
Technical statusPublication controlled
Release date2026-10-06
DeploymentWebroot overlay required

Production boundary: this certification covers the Reactor Programs branch package. Parent-site shared CSS, navigation, search, logo, and global assets remain controlled by the Aurora website root and must already exist in production. Live deployment is not implied until the package is uploaded and the production URLs are rechecked.